Order Code
|
Topic
|
Applicable Standards
|
Dispatch Date
|
Results Due
|
Additional Information
|
$AUD (ex GST)
|
|
12e34
|
Ball Pressure Test
|
IEC 60695010-2 ed 2.0 and all
product standards referencing this test
|
16th April 2012
|
27th May 2012
|
samples are plastic plaques
|
$740
(inclusive of shipping)
|
|
12e29
|
Glow Wire Test / Needle Flame
Test
|
IEC 60695-2-10 ed 1, and/or
IEC 60695-2-12 ed 2 and/or, IEC 6069501105 ed 1 and all product
standards referencing this test
|
4th June 2012
|
16th July 2012
|
samples are plastic plaques
|
$740
(inclusive of shipping)
|
|
12e31
|
Tracking Test
|
IEC 60112:2003 and all product
standards referencing this test
|
2nd July 2012
|
13th August 2012
|
samples are plastic plaques
|
$740
(inclusive of shipping)
|
|
12e27
|
Plug Discharge / Voltage Decay
Test
|
IEC 60065 (all editions),
and/or IEC 60950-1 (all editions) and/or IEC 60335-1( all editions) and/or
IEC61010 (all editions)
|
20th August 2012
|
3rd October 2012
|
The sample is a black box with
the possibility for various test arrangements
|
$800
(inclusive of shipping)
|
|
10e39B
|
RoHS regulated substances
|
IEC 62321
|
To be advised
|
To be advised
|
Samples of plastic to be tested for polybrominated biphenyls,
polybrominated diphenyl ethers
|
To be advised
|
|
10e40
|
EMC (Conducted Emmissions on Mains Terminal Ports)
Closed
to further enrolments
More
Information
|
CISPR22
and related standards
|
1st
March 2011, then according to a schedule. Samples are shared amongst many
laboratories
|
2
weeks after receipt date.
|
Comb
generator noise source will be sent to many laboratories in turn.
Frequency range of interest 150 kHz - 30 MHz. Samples must be
returned after testing.
|
$720
|
|
12e40
|
EMC (Conducted Emmissions on Mains Terminal Ports)
|
CISPR22
and related standards
|
Date
to be advised.
Will
start in 2012
|
2
weeks after receipt date.
|
Comb
generator noise source will be sent to many laboratories in turn.
Frequency range of interest 150 kHz - 30 MHz. Samples must be
returned after testing.
|
$820
(CB fee included)
|
|
05e22
(closed)
|
Photovoltaics
|
IEC 61215 (2nd Edition)
|
Variable, samples are shared between many laboratories
|
3 weeks from receipt date
|
One PV module for performance/safety tests and one resistor box
(for high voltage test to 3000V) will be sent
|
$500 plus shipping costs. Each
participant must send the sample by airfreight to the next laboratory
|
|
05e21
|
Laser
Final
Report
|
IEC 60825-1 and -2
|
Variable, samples are shared between many laboratories
|
3 weeks from receipt date
|
One line laser unit will be sent for basic energy measurements
|
$570
|
|
11e41
|
Creepage and Clearance
draft report (expected
results)
|
IEC 60664-1 and all standards
where this test is called.
|
30th May 2011
rescheduled shipping date
8th June 2011
|
15th July 2011
rescheduled 31st July 2011
|
2 components on which
specified determinations are to be made
|
$570
|
|
11e42
|
Earthing Resistance
Results
Sheet
|
IEC 60335-1, 60598-1, 60950-1,
60665, 60745-1, 61558-1 (refer to order form for specific editions)
|
rescheduled shipping date:
week commencing 19 December 2011
|
8 February 2012
(additional testing time
has been allowed due to holiday season)
|
"black box" on which
specified determinations are to be made
|
$570
|
|
11e43
|
Electric Strength Test/High
Voltage Test
|
IEC 60950-1, 60335-1, 61180,
62771-1, 62475 (refer to order form for specific editions)
|
Re-scheduled due to delay in
11e42
|
new results due date to be
advised
|
"black box on which
specified determinations are to be made
|
$570
|
|
11e38
|
Temperature Rise, Switch Mode Power Supply
(Supplementary
Round to 10e38)
Instructions
|
IEC 60950, IEC 60065, IEC 61558
|
week commencing 29th November 2011
|
31st January 2012
|
One Switch Mode Power Supply unit to be tested at two specified
input conditions using thermocouples in specified locations. Following
this, participants will be requested to test the units in accordance with
their standards, reporting the temperature rise applicable to the
particular standard.
|
$500
|