Introduction

 

QA Programs

 

Other products and services

 

Order Form IFM

 

CTL - Reference Page.

 

Biology Reference Page

 

Terms and Conditions

 

Home

Go Back to QA Program Selection Back to Electrical Testing Programs
Ask us a question Order Form
Look at Diagrams for Programs Home Page

CTL Program Status

click here for order information                                CB Scheme Administrative Fee

2010 schedule

Please note that CB Scheme laboratory PTP participation is now subject to an administration fee.

Order Code

Topic

Applicable Standards

Dispatch Date

Results Due

Additional Information

$AUD (ex GST)

09e38

(closed)

Temperature Rise, Switch Mode Power Supply

Interim Report

IEC 60950, IEC 60065, IEC 61558

22nd February 2010

revised due date

15th April 2010

One Switch Mode Power Supply unit to be tested at two specified input conditions using thermocouples in specified locations. Following this, participants will be requested to test the units in accordance with their standards, reporting the temperature rise applicable to the particular standard.

$500

10e38

Temperature Rise, Switch Mode Power Supply

IEC 60950, IEC 60065, IEC 61558

revised: 22nd February 2011

revised: 5th April 2011

One Switch Mode Power Supply unit to be tested at two specified input conditions using thermocouples in specified locations. Following this, participants will be requested to test the units in accordance with their standards, reporting the temperature rise applicable to the particular standard.

$500

10e39A

RoHS, regulated substances

Interim Report

IEC 62321

28th February 2010

revised due date

30th April 2010

Two samples of solder, two samples of ceramic material to be tested for levels of:  Lead, Cadmium, Mercury, and Chromium VI.

$570

09e31

Tracking Test

IEC 60112, applicable to all product standards where the test is called up.

29th March 2010 (equipment audit period starts.

samples dispatched mid May)

round 1 due 30th June

round 2 due 30th July

round 3 due 30th August

round 4 due  30th September

This program is "check sample" (CSP) format.  Six short rounds will be conducted at monthly intervals. Each round involves performing tracking tests at specified voltages where tracking (including number of drops to tracking), ignition, and depth of erosion are reported).  Each round report will be issued within 10 working days of the due date, allowing participants to gauge their performance before the next round. The final report summarises all rounds.

$450

09e37

(closed)

Working Voltage

IEC 60335-1, IEC 60950-1, IEC 60065

 Revised shipping date: 28th June 2010

Instructions

revised results due date 15th September 2010.

Note clarification to instructions!

One "Black Box" to be sent for determination of Working Voltage under specified standard conditions.  In addition, opportunities will be provided for normal voltage measurements to be made for calibration checks.

$500

10e37

Working Voltage

IEC 60335-1, IEC 60950-1, IEC 60065

Draft instructions  

revised: 5th April 2011

revised: 17th May 2011

One "Black Box" to be sent for determination of Working Voltage under specified standard conditions.  In addition, opportunities will be provided for normal voltage measurements to be made for calibration checks.

$500

09e35

Cables, conductor resistance

IEC 60227

20th September 2010

31st October 2010

Two samples of standard appliance cables to be sent for determination of conductor resistance

$570

10e39B

RoHS regulated substances

IEC 62321

To be advised

To be advised

Samples of plastic to be tested for polybrominated biphenyls, polybrominated diphenyl ethers

To be advised

10e40

EMC

To be advised

To be advised

To be advised

To be advised

To be advised

05e22

Photovoltaics

IEC 61215 (2nd Edition)

Variable, samples are shared between many laboratories

3 weeks from receipt date

One PV module for performance/safety tests and one resistor box (for high voltage test to 3000V) will be sent

$500 plus shipping costs.  Each participant must send the sample by airfreight to the next laboratory

05e21

Laser

IEC 60825-1 and -2

Variable, samples are shared between many laboratories

3 weeks from receipt date

One line laser unit will be sent for basic energy measurements

$570

 

Completed Programs  (Passwords are required to access these reports)

Touch Current 09e36

Report

Plug Discharge suitable for IEC 60950 and 60335

05e27-A

Report

Plug Discharge suitable for IEC 60065 and 61010

05e27-B

Report

* Cost is quoted in Australian dollars. Shipping will be charged in addition. Australian participants should add GST

Back to top of page

IFM Quality Services Pty Ltd

IFM, Working with you, for you

PO Box 877, Ingleburn 2565, AUSTRALIA

4/58 Stennett Road Ingleburn NSW 2565 Australia

Telephone:  +61 2 9618 3311

 Facsimile: +61 2 9618 3355

Email:  ContactIFM@ifmqs.com.au
                                                                            
Date of page update: August 26, 2010